Piping installation – Mochovce nuclear power plant
Slovakia – MochovceNuclear power
Illustrative photo
Project description
Specialist pipefitting and locksmith work in the process areas of the Mochovce nuclear power plant. The project covered providing qualified technical staff for piping installation, the related locksmith and assembly work, and technical support during the work in line with the client's requirements and the applicable safety regulations.
Scope of work
Piping installation
Locksmith and assembly work
Qualified technical staff in the plant's process areas
Electrical engineering and industrial installations
Qualified electricians for electrical installations, mounting and wiring of electrical equipment and switchboards, basic measurements and technical support on projects.